Wulugul Walk

Client: Crown Resorts and SMC Marine

Scope:

  •  250T structural steel fabrication
  • Open-end steel tube piles G350 Australian Standard
  • 25m x 10m Painted steel pontoon
  • 20m Painted steel gangway
  • 25T of Stainless-Steel fabrication, piles, braces, brackets
  • 50T of Structural Aluminium Module fabrication
  • Interpretation of design, full 3D modelling of structures and comprehensive shop detailing (250 drawings)
  • Significant value engineering and cost saving efficiencies for the Client
  • Breakbulk shipment and logistics management of steel pontoon delivery directly to Sydney Harbour for discharge into the water
  • Independent 3rd party Quality Assurance